Sign In

Icon for Ramara

Building-Application-Forms
Skip Navigation LinksRamara Township > Building-Application-Forms

​Building Application Forms

Permit applications will require any applicable completed forms, two copies of full building drawings and all applicable fees must be paid in full when submitting to our office for review. Please view the Building Permit Checklist.

- New Home Package​ - (Revised Feb 2020) Planning Department approval must be obtained separate to this package

Building Permit Application

- Owner / Designer Declaration Form

- Schedule 1 - Designer Information

- Energy Efficiency Design Summary Form

Septic Permit Application

- Property Owner(s)' Authorization

- Commitment to General Review by Architect and Engineer


Miscellaneous Forms

- Driveway Entrance Application Form

Greenblade 911 Municipal Addressing Application Form

Solar / Generator Power Signage Application Form

- Application for Rural Mail Box Location Permit

 

 Backflow Forms

  - Backflow Certificate of Compliance

  - Backflow Cross Connection Survey

  - Backflow Prevention Testing and Inspection Report

  - Backflow Test Assembly Tag

 

On-Site Sewage Maintenance Inspection Program

- Pumpout Report Form - (Revised 2019)

 

Planning Application Forms

 - Consent (Revised Feb 2020) - Severance/Consent Guide​ (Revised 2020)

 - Minor Variance (Revised Feb 2020) Minor Variance Guide (Revised 2020)

 - Official Plan Amendment (Revised Feb 2020)

 - Pre-Consultation Application

 - Pre-Permit Zoning Approval (Revised 2019)

- Renewable Energy Application

 - STR - Short Term Rental Declaration Form

 - Site Plan Application, Commercial (Revised Feb 2020)

 - Site Plan Approval, Residential (Revised Feb 2020)

 - Zoning Bylaw Amendment (Revised Feb 2020)