Sign In

Ramara Township

Skip Navigation LinksRamara Township > Plowing-works

Plowing

After becoming aware of the fact that snow accumulation on a roadway is greater than the depth set out in the following table, snow clearing resources will be deployed. Roads will be plowed within the time lines set out.

Plowing will commence no earlier than 4 a.m. and cease at 8 p.m., unless severe conditions or emergency services require it. Plowing outside these core hours (4 a.m. to 8 p.m.) shall be authorized by the Manager of Municipal Works or CAO.

Class of RoadDepthTime
38 cm (3”)12 hours
48 cm (3”)16 hours
510 cm (4”)24 hours