Canal Maintenance

The Township of Ramara’s multi-faceted canal maintenance protects the health and navigability of Lagoon City’s canals through a variety of annual programs.

Aquatic Weed Harvesting

To avoid and mitigate the potential for negative effects to fish and fish habitat, no cutting may take place prior to July 15. After that time, the harvesters will follow a pre-determined route through the canals to cut the weeds underneath the surface of the water. Routes and locations may change without prior notification due to weed growth, weather or other unforeseen circumstances.

Typical Routes: Scoop Dogg & Harvey the Harvester

Aquatic weed harvesting routes and locations will be determined and modified during the harvesting season. Routes and locations may change without prior notification due to weed growth, weather or other unforeseen circumstances.  

  1. Cedar Lagoon
  2. Windward Lagoon
  3. Beaver Lagoon
  4. Canoe Lagoon
  5. Concord Pond
  6. Leeward Lagoon South
  7. Gondola Lagoon (East of Laguna)
  8. Lagoon City Marina
  9. Gondola Laguna (West of Laguna to Pier One)
  10. Turtle Lagoon
  11. Pike Lagoon
  12. Beach Cove
  13. Harbour Lagoon
  14. Entrance to Lagoon City from Lake Simcoe

Track the Harvesters - Harvesting Locations

Date Scoop Dogg Harvey the Harvester
July 21

Gondola Lagoon (East of Laguna)

Concord Pond

Leeward Lagoon South

Canoe Lagoon

Week of July 27

Canoe Lagoon

Windward Lagoon

Beaver Lagoon

Canoe Lagoon

Windward Lagoon

Beaver Lagoon

Week of August 4

Turtle Lagoon

Cedar Lagoon 

Concord Pond

Turtle Lagoon

Cedar Lagoon 

Concord Pond

Other Canal Maintenance Programs

Canal skimming occurs each summer in conjunction with the July 15 start of aquatic weed harvesting. It removes surface debris from Lagoon City’s waterways, and the collected material is transported by barge to off-loading locations for disposal.

Lagoon City’s Clean-Flo™ System is a laminar or smooth flow delivery method that directs a steady stream of gently moving microbubbles from the bottom of the water to the surface. The introduction of increased oxygen throughout the water column starts a sequence of beneficial events including aiding in reduction of odour and gases and organic muck.

Dredging, the physical removal of sediments and debris from the bottom of Lagoon City’s waterways, is accumulated when organic material from runoff containing grass clippings, leaves, branches, dead and decaying aquatic weeds and algae, fertilizers and waste, fill the canal bottoms decreasing canal depth.

Dredging projects are identified and budgeted in the year preceding when they will occur. Projects are determined through investigation completed by the Township of Ramara’s retained engineers and are typically scheduled during the early fall of the year following identification and investigation. Projects are budgeted on an as-required basis and operation of Lagoon City’s Clean-Flo™ System works to decrease the disruption of the canal bottoms Conventional Dredging causes.

Shorewall planting offers several benefits:

  • Prevents phosphorus leeching into the canals
  • Deters geese from entering properties
  • Provides habitat for bees and butterflies

Native plants also offer the additional benefit of being lower maintenance by thriving with less water and not needing pesticides or herbicides.

View the article, Shorewall Planting with Native Plants, written by former LCPWC member Skip Beattie for more information.

Frequently Asked Questions

Harvesting occurs Monday to Thursday between 7 a.m. and 4 p.m. and Friday until noon. Harvesting operations stop on the weekend to ensure the safety of the harvesters, their operators and passenger vessels accessing Lagoon City’s canals.

Lagoon City’s Aquatic Weed Harvesters are limited to harvesting no closer than six feet from shorewalls or any boats for the safety of the harvesters, their operators, and moored vessels.

Harvested weeds are the responsibility of residents who rake weeds at their shorewalls. Harvested weeds may be composted.

Debris in the canals can be reported by accessing the Township of Ramara's Report a Concern form and selecting "Lagoon City Canal Maintenance."

Shorewall planting acts to:

  • prevents phosphorus from leaching into the Lagoon City’s canals,
  • deters geese from entering properties, and
  • provides habitat for bees and butterflies.

Native plants are lower maintenance and can thrive with less water than non-native. Native plants don’t require the use of pesticides or herbicides to promote their growth and health.

Visit the Lake Simcoe Region Conservation Authority to learn about 100 Natives Species You Can Source.

  • Scare tape can be strung across the shorewall, so that it flutters in the breeze and will deter geese from entering your property.  Scare tape can be purchased from the Township Administration Building during business hours.
  • Shorewall plantings can deter geese from entering properties.

The Township of Ramara prohibits the placing, dumping or disposing of debris, including grass clippings, leaves, or feces (including goose),  into the canal as stated by the Township of Ramara’s Bylaw 2020.63. Dumping of waste can be reported by accessing the Township of Ramara’s Report A Concern.

For additional resources, visit the Goose Management Program page.

Contact Us

Corporation of the Township of Ramara
2297 Highway 12, PO Box 130, Brechin, ON, L0K 1B0

T. 705-484-5374
E. ramara@ramara.ca

 

Sign up for our eNewsletter

Stay up to date on the Township's activities, events, programs and operations by subscribing to have notifications sent directly to your inbox.