Close Emergency Alert Notification
Close Browser Compatibility Notification
Browser Compatibility Notification
It appears you are trying to access this site using an outdated browser. As a result, parts of the site may not function properly for you. We recommend updating your browser to its most recent version at your earliest convenience.
Skip to Content
HomeA-Z ServicesContact UsHave Your Say

Township of Ramara Logo

Contact Us Contact Us Main menu icon Main menu icon white version
Township of Ramara Logo
  • Living Here
    Living Here
    • Animal Services
    • Building and Construction
    • Bylaw Enforcement
    • Churches and Cemeteries
    • Community Calendar
    • Facility Rentals
    • Fire and Emergency Services
    • Garbage and Recycling
    • Have Your Say
    • Health Care
    • Library
    • Maps
    • New Resident Information
    • Online Services
    • Parking in Ramara
    • Property Taxes
    • Report a Concern
    • Roads
    • Septic Systems
    • Sewer Systems
    • Stay Informed
    • Stormwater
    • Water
  • Recreation and Community
    Recreation and Community
    • Arts, Culture and Heritage
    • Churches and Cemeteries
    • Community Calendar
    • Community Volunteers
    • Earth Day Community Clean-ups
    • Facility Rentals
    • Library
    • Maps
    • Parking in Ramara
    • Parks, Trails and Beaches
    • Rooted in Ramara
    • Recreation and Registration
    • Visit Ramara
  • Business and Development
    Business and Development
    • About Ramara
    • Bids and Tenders
    • Building and Construction
    • Business Licences
    • Business Resources
    • Chamber of Commerce
    • Economic Development
    • Maps
    • Planning Services
    • Short Term Rental Accommodations
    • Visit Ramara
  • Municipal Office
    Municipal Office
    • Accessibility
    • Agendas and Minutes
    • Applications, Licences and Permits
    • Bids and Tenders
    • Boards, Committees and Commissions
    • Budgets and Financial Services
    • By-laws
    • COVID-19
    • Elections
    • Employment Opportunities
    • Freedom of Information
    • Have Your Say
    • Meet Council
    • News and Notices
    • Plans, Reports and Studies
    • Policies
    • Property Taxes
    • Wards and Ward Boundary Review

Capital Projects

HomeLiving HereRoadsCapital Projects
 
  • Open new window to share this page via Facebook Facebook
  • Open new window to share this page via LinkedIn LinkedIn
  • Open new window to share this page via Twitter Twitter
  • Email this page Email
  • Roads
    Toggle Section
    • 911 Municipal Addressing Application
    • Capital Projects
    • Driveway Entrance Application
    • Fence Bonus Policy
    • Mailbox Permit
    • Mosquito Control Program
    • Oversized Loads
    • Reduced Load Restrictions
    • Road Maintenance
    • Road Name Review
    • Winter Control
  • Animal Services
    Toggle Section
    • Dog Shelter and Adoptions
    • Livestock Claims
    • Wildlife
  • Building and Construction
  • Bylaw Enforcement
    Toggle Section
    • Fireworks
  • Churches and Cemeteries
  • Community Calendar
  • Facility Rentals
  • Fire and Emergency Services
    Toggle Section
    • Emergency Management
    • 911 Municipal Addressing Application
    • Fire and Rescue Services
      Toggle Section
      • Fire Inspections
      • Fire Safety
      • Fire Stations
      • Fireworks
      • Message from the Fire Chief
      • Open Air Burning
      • Volunteer Firefighters
      • Water Tanker Shuttle Accreditation
  • Garbage and Recycling
  • Have Your Say
    Toggle Section
    • Internet
    • Playground Replacement Projects
  • Health Care
  • Library
  • Maps
  • New Resident Information
  • Online Services
  • Parking in Ramara
  • Property Taxes
    Toggle Section
    • Municipal Property Assessment (MPAC)
    • Pay a bill
      Toggle Section
      • Paperless Billing
    • Tax Certificates and Other Compliance letters
    • Tax Rates
    • Tax Sales
  • Report a Concern
  • Septic Systems
    Toggle Section
    • Septic Permits
    • On-Site Sewage Reinspection Program
  • Sewer Systems
    Toggle Section
    • Inflow and Infiltration Control
    • Septage Receiving
    • Sewer Backups
  • Stay Informed
    Toggle Section
    • Community Information System
  • Stormwater
  • Water
    Toggle Section
    • Bulk Water Services
    • Drinking Water Quality and Monitoring
    • Drinking Water Source Protection
    • Private Well Water Testing
    • Utility Billing and Rates
    • Water and Wastewater Projects
    • Water Meters
    • Watering Restrictions

Each year, the Township of Ramara invests in improving parts of our infrastructure, such as canals, bridges, roads, facilities and water/wastewater infrastructure. Find more information here on upcoming and current major capital projects.

Road Closure Notices 

2023 Planned Projects
ProjectLocationUpdate
South Footbridge Repair The South Footbridge spans from South Island to Turtle Path.
  • The base work and inspections have been completed, and it was determined that the anchor blocks and plates are in good repair.
  • Crews have backfilled the anchors, measured the suspension cables, and sent off the measurements of the suspension cables to the manufacturer assembling the cables at their manufacturing facility.
  • The new cable lengths are on backorder. Once shipped, the cables will be installed on the bridges. The anticipated delivery of the new cables is the end of May to the beginning of June.
  • Upon receiving the cables, the contractor will return and remove the existing cables independently, reinstall the new cable, then tension and attach the stay cables to the bridge deck.
  • Once the work has been completed, the site will return to pre-existing condition, including re-paving the walk ways up to the bridge on both sides.
  • Marine traffic is permitted under the bridge; however, pedestrian traffic is not permitted at this time. 
Playgrounds

Bluebird Park

Lagoon City Beach and Park

  • Community consultations are complete
  • Design #1 received 48% of the votes.
  • Tender report submitted to the May 8, 2023, Committee of the whole meeting. 
  • Construction timelines will be posted after Council approves the tender report at the May 29, 2023, Council meeting. 
2023 Planned Road Projects
RoadLocationProject         

Amilia Drive

Lake Simcoe to 3428 Amilia Drive

 

  • Ditching

Bayshore Drive Bayshore Drive to Sandlewood Trail
  • Ditching

Concession Road B-C (off of Boundary) 6013 Concession Road B-C to 6087 Concession Road B-C
  • Ditching
Concession Road 3 Lake Simcoe to 2428 Concession Road 3
  • Ditching
Creighton Street Paget Street to Florence Avenue
  • Ditching
Edgehill Road Bonnie Beach Road to the east end
  • Hot Mix
Ellen Street Winchester Street to Creighton Street
  • Slurry Seal
Fairgrounds Road

Flat rapids to 300m east

  • Slurry Seal
Fairgrounds Road

County Road 169 to Brooks Sideroad

  •  Hot Mix
Florence Avenue 193 Florence Avenue to 203 Florence Avenue
  • Ditching
Florida Avenue Clean out of the ditch through the park
  • Ditching 
Fountain Drive

Plum Point Road to Fountain Drive

  • Ditching     
Fountain Drive

Plum Point Road to west end

  • Surface Treatment   
Harry's Lane

Edgehill Road to the south end

  • Hot Mix
Hilltop Road

McCrae Park Road to Lakeview Drive

  • Slurry Seal
Lake Avenue

Poplar Crescent to Beaver Trail

  • Slurry Seal
Lakeshore Drive

Concession Road 1 to Concession Road A

  • Slurry Seal
Lakeview Drive

From the west end to the east end

  • Slurry Seal
Leo Crescent

Edgehill Road to the south end

  • Hot Mix
Longford Mills Road

Rama Road to the east end

  • Hot Mix
Oakridge Drive

County Road 169 to Pineridge Road

  • Slurry Seal
Paget Street

Creighton Street to Winchester Street

  • Slurry Seal
Park Lane (Bayshore Village) Bayshore Drive to the west end
  • Ditching 
Parkside Drive McCrae Park Road to Lakeview Drive
  • Slurry Seal
Plum Point Road Concession Road 10 to Fountain Drive
  • Ditching 
Ramara Road 47 Concession Road 1 to Simcoe Road
  • Hot Mix
Sideroad 25 Concession Road 12 south to top of hill
  • Ditching 
Simcoe Road The CN Tracks to Ramara Road 47
  • Hot Mix
Tuppy Drive Edgehill Road to the south end
  • Hot Mix

Victoria Park Road

(Partnered with Rama First Nation)

Williams Road to the north end
  • Hot Mix
Wellington Street Paget Street to Patricia Street
  • Surface Treatment
Williams Street Fountain Drive to the end
  • Ditching
  • Surface Treatment
Winchester Street Creighton Street to the Park and Parking Lot
  • Surface Treatment
Zachary Crescent Cleanout of ditch between 4696 and 4700
  • Ditching 

Road Maintenance 

Visit our Road Maintenance page to learn more how the Township maintains its roads in accordance with the Provincial Minimum Maintenance Standards.

Contact Us


Subscribe to this Page
A-Z Services:

Municipality of Trent Hills Footer Logo

Current Fire Rating

Fire rating showing moderate

© 2020 Township of Ramara
2297 Hwy 12, PO Box 130
Brechin ON L0K 1B0

Office Hours
Monday to Friday, 9:00 am to 4:30 pm


Phone 705-484-5374
Toll-free 1-800-663-4054 

Staff Portal

Council Portal

Webmail

View our Facebook Page View our Twitter Page View our Instagram Page View our YouTube Page
Accessibility|Feedback|Privacy|Sitemap